INDUSTRIAL EMISSIONS CONTROL TECHNOLOGY X CONFERENCE
TECHNICAL SEMINAR
A. | MINI WORKSHOPS | ||
A.1. | ERM Compliance Workshop | ||
A.2. | EPA Data Base Evaluation for Compliance |
B. | FORUMS | ||
B.1. | Informal Owners’ Only Forum – See summary | ||
B.2. | Informal Equipment Suppliers, Engineering and Environmental Service Consultants’ Only Forum – See summary | ||
B.3. | Review of Concurrent Forum Discussions – See summary |
C. | State & Federal Officials Shirt Sleeve Information Session (see summary) |
D. | Short Course – Basic Principles of Combustion that Affect Plant Operation and Ultimately Affect Emissions Produced |
E. | Environmental Rules, Regulations and Implementation in the Industrial Sector A Panel Discussion |
|
E.1. | US EPA Boiler and Utility Rules Lost in Space | |
E.2. | Stationary and Area Source Committee Activities | |
E.3. | State of Maine | |
E.4. | SNCR and I-NOx TM Systems for Industrial Boilers | |
E.5. | Regulatory Update | |
E.6. | Implementing Environmental Rules |
F. | Particulate & Multi-Emissions Control Technologies for HCl, SO2 and Hg Compliance or Advantage Back-end Technologies to Meet Future Regulations |
||
F.1. | Emission Control Systems at Virginia Tech | ||
F.2. | Lextran Panacea for Small Boilers | ||
F.3. | Mercury Removal in Dry Scrubbers Coal-Fired Generators with Amended Silicates | ||
F.4. | Boiler MACT and ESP Particulate Removal Performance | ||
F.5. | Operating Results from Biomass Project – Sample Case Presentation |
G. | Sorbents and MACT Compliance Possibilities A Panel Discussion |
|
G.1. | Calcium DSI for Acid Gas Control | |
G.2. | Meeting the New EPA IBMACT and MATS Rules | |
G.3. | The Activated Carbon Landscape has Changed | |
G.4. | Carmeuse Lime & Stone, Inc. – See summary | |
G.5. | Meet HCl Challenge from Industrial Boiler MACT | |
G.6. | NatronX Technologies – See summary |
H. | Choosing the Right Bag Filters |
I. | Complying with Boiler MACT | ||
I.1. | Boiler MACT Compliance Requirements for Area and Major Sources | ||
I.2. | Environmental Auditing Compliance in the Here and Now | ||
I.3. | CEMs/COMs QA Planning | ||
I.4. | HCL Monitoring | ||
I.5.a | CEM’s Technology Analytical Solutions |
||
I.5.b | CEMs Technologies and Sampling Fundamentals Hg Monitoring and Data System Trends | ||
I.5.c | Dilution Full Extraction |
J. | Complying with Work Practice Standards for Boiler MACT | ||
J.1. | Area Source Boiler Tuning Considerations | ||
J.2. | How One Company Does Energy Assessments | ||
J.3. | Boiler Tune-ups & Assessments: Tips, Traps & Opportunities | ||
J.4. | Combustion Technologies to Achieve MACT | ||
J.5. | CHP – Profitable Solution to MACT | ||
J.6. | Maintaining Fuel Flexibility with Grate Fired Boilers | ||
J.7. | DSl and ACl Demonstration Testing with a Rebuilt ESP |